๐Ÿ‘ทCost Components

Project:
Stiffeners Bulkheads Pattern Labor
1
Labor Rate Card
Defines loaded โ‚น/hr rates โ€” shared across Stiffeners, Bulkheads, Pattern pages
Shared across all pages
Grade Name Role Description Basic Wage (โ‚น/day) Hrs/day Basic Rate โ‚น/hr Overhead Mult. Loaded Rate โ‚น/hr
Overhead Multiplier covers PF, ESI, Bonus, Tool allowance. Default 1.3 = 30% overhead. Loaded Rate = Basic Rate ร— Multiplier. Changes here automatically update dropdowns on other pages (stored in Firestore /laborRates).
2
Hull Body Labor Estimate
Build activities for main hull lamination โ€” cost feeds Dashboard
โ‚น 0.00
Activity Custom Name Labor Grade Hours Cost (โ‚น)
Total Man-hours 0.0 hrs Hull Body Labor Cost โ‚น 0.00
Manhour Summary by Grade
Total hours and cost breakdown per labor category
Labor Grade Total Hours Total Cost (โ‚น)
๐Ÿ‘ท
Total Hull Body Labor
โ‚น 0.00
Total Man-hours: 0.0
This total feeds the Estimate Dashboard automatically